Monday, August 17, 2009

Bathroom Update

How's the bathroom coming along? Great! Look we now are without a toilet and vanity but the floor is still good so I'm happy. We're unable to install a shower head in the bathtub b/c of the plumbing in the tub. So the only way to make that possible would be rip out the tub too. Looks like the shower behind the door is staying.

We checked out bead board and I'm not sure what height it should be . . . they have some pre-cut pieces that are 32" or we can purchase the birch pieces in larger sheets and cut it to 48". And the toilet situation, Ryan would like to find one with two types of flush flows (for #1 and #2 :) but we haven't had much luck.

Note the lack of insulation, yep go ahead and add that to the list too.

2 comments:

Melissa Bruning said...

Hmmm, I would do the 48" b-board and Andy and Joelle have the 1 or 2 flush toilets and they really like them. Wow, well at least redoing a bathroom is cheaper than a kitchen. Glass half full honey. Remember, glass half full.

lab said...

looks like you will almost have an entire new house. keep on - you can look back with lots of memories... most of them fond.